We plan to devote FY 92 to the R&D phase and to build and test a prototype. The jigs and tooling for constructing the calorimeter will be developed and completed as part of the R&D effort (they will be used in constructing the prototype). This effort is to be supported by the 70.5 k$ of R&D funds requested for FY 92.

In FY 93 we propose to construct 1/3 of the calorimeter towers and to instrument 1/4 of the towers for the FY 94 heavy ion run. The cost for the electronics is contained in the BNL HEEP budget but the photomultipliers, their high voltage and cables are listed here as part of the Yale HEP group budget. Table gif summarizes the FY 93 costs.

   table1603
Table: Calorimeter FY 93 cost breakdown

In FY 94 we plan to complete the calorimeter. The breakdown is given in Table gif.

   table1618
Table: Calorimeter FY 94 cost breakdown