The straw tube R&D will be carried out in FY 92 (at a cost of 44.2 k$)
and construction of S2 and S3 initiated. The breakdown for FY 92 is given in
Table .
Table: Straw Tube FY 92 cost breakdown
In FY 93, S2 and S3 will be completed and the material for S1 will be acquired.
Table gives the breakdown.
Table: Straw Tube FY 93 cost breakdown
In FY 94, S1 will be completed in time to be used in the run in FY 95.
The breakdown is given in Table .
Table: Straw Tube FY 94 cost breakdown