The straw tube R&D will be carried out in FY 92 (at a cost of 44.2 k$) and construction of S2 and S3 initiated. The breakdown for FY 92 is given in Table gif.

   table1634
Table: Straw Tube FY 92 cost breakdown

In FY 93, S2 and S3 will be completed and the material for S1 will be acquired. Table gif gives the breakdown.

   table1649
Table: Straw Tube FY 93 cost breakdown

In FY 94, S1 will be completed in time to be used in the run in FY 95. The breakdown is given in Table gif.

   table1664
Table: Straw Tube FY 94 cost breakdown