Hodoscope System

In FY 92, we must carry out the R&D on the hodoscope system (at a cost of 20 k$) and prepare tex2html_wrap_inline4061 of the scintillators and photomultiplier tubes. We also plan to construct 1/3 of the high voltage system and prepare 1/3 of the cables. A calibration system as well as mounting and support hardware will also be constructed. Some electronics will also need to be purchased to carry out tests of the system components. These could, perhaps be obtained from BNL HEEP but are listed here as part of the WNSL group budget. These electronics will be brought to BNL and used in the experiment. A summary is given in Table gif.

   table1572
Table: Hodoscope system FY 92 cost breakdown

In FY 93, the remaining 1/3 of the scintillators and 2/3 of the high voltage system will be built. The balance (2/3) of the cables will be obtained. A breakdown is given in Table gif.

   table1587
Table: Hodoscope system FY 93 cost breakdown



root
Tue Jan 21 17:29:21 EST 1997