Prototype Testing

Prototype construction and testing is to be initiated in fall 1991. Chambers S2 and S3 are similar to straw tube arrays documented in the literature. The prototype R&D includes testing various options for gas flow, high voltage connections, signal connections, and mechanical integrity. The feasibility of using fast gases (CF tex2html_wrap_inline3991 mixtures) in E864 will be studied in a test beam, where the tubes must meet the E864 efficiency and stability requirements while minimizing pile-up.

The R&D work is planned so that chambers S2 and S3 will be ready for operation for phase 1 running in 1994. Chamber S1, which has the added complication of operating inside the vacuum enclosure, is planned to be available for phase 2 running.

Specific development tasks include the following:

Prototype evaluation tasks include the following, using both cosmic rays and beam tests:

The prototypes to be constructed are as follows:

The costs for the development and prototypes are listed in Table gif.

   table1267
Table: Costs of Development and Prototypes.