The late energy trigger is derived from the calorimeter signals. The design and commissioning of the late energy trigger is a responsibility of the BNL collaborators.
The design of the trigger will be carried out in FY 92 and the construction of approximately 1/3 of it (at a cost of 40 k$) carried out in FY 93, to be ready for use in the FY 94 run.
The remainder, at a cost of 60 k$, will be built in FY 94 for use in the FY 95 run.